How We Work

From Concept to Tested Hardware

Step 1Share a BriefStep 2Sign NDAStep 3Specs & Quote30% AdvanceSteps 4โ€“6R&D, Design &Simulation30% on ProgressSteps 7โ€“8Fabrication &TestingStep 9Delivery40% + Source Files
  1. 1Share a Brief
  2. 2Sign NDA
  3. 3Specs & Quote30% Advance
  4. 4โ€“6R&D, Design & Simulation30% on Progress
  5. 7โ€“8Fabrication & Testing
  6. 9Delivery40% + Source Files

Payment schedule: 30% advance ยท 30% on progress ยท 40% on completion
Source files are delivered after full payment ยท Bank transfer details โ†’

Every WAVEELECA ENGINEERING project follows a clear, nine-step process that keeps your work confidential, on schedule and fully documented, from the first message to final delivery. You always know what is happening, what comes next and what you will receive.

  • 1. Share a Brief
  • 2. Sign NDA
  • 3. Full Specifications
  • 4. R&D
  • 5. Design
  • 6. Simulation
  • 7. Fabrication
  • 8. Testing
  • 9. Deliverables
01

Step 1 ยท Tell us what you need

Share a Brief About Your Project

Start by sending us a short overview of your project. At this stage there is no need to share confidential details, just enough for us to understand what you need and whether we are the right team for it.

What to send us

  • Short description of the product or idea
  • Approximate budget range
  • Expected timeline or deadline

What you receive

  • Quick reply from our engineering team
  • Initial feedback on feasibility and approach
02

Step 2 ยท Confidentiality first

Sign NDA

Before you share any confidential information, we sign a mutual Non-Disclosure Agreement (NDA). Contact us and we will send you our NDA to review and sign, or we are happy to sign your own NDA.

Request our NDA: contact us by email, WhatsApp or the website form and we will send it to you.

What we do

  • We send you our mutual NDA, or review yours
  • Agreement on intellectual property (IP) ownership
  • Secure handling of all project files

What you receive

  • Signed NDA for your records
  • Written confirmation that all design IP belongs to you
03

Step 3 ยท Detailed requirements and proposal

Share Full Specifications and Files

Once the NDA is signed, share the complete technical details: specifications, drawings, existing design files, datasheets, standards and any reference designs. We review everything in an online meeting and send a clear technical and commercial proposal.

Payment: an advance payment of 30% of the agreed quotation is made before design work begins, 30% after agreed progress, and the remaining 40% on completion. All payments are made by bank transfer (view bank account details), and an invoice is issued for every payment.

What we do

  • Detailed review of specifications and files
  • Clarification of targets, constraints and standards
  • Definition of scope, milestones and timeline

What you receive

  • Technical proposal with scope and milestones
  • Final quotation and payment terms agreed before any work starts
  • Project starts after a 30% advance payment
04

Step 4 ยท Feasibility and concept

Research & Development (R&D)

Our PhD-led team studies the problem in depth before design begins. We review the state of the art, compare possible architectures and select the most suitable concept for performance, cost and manufacturability.

What we do

  • Feasibility study and technology review
  • Concept and architecture selection (antenna, PCB, RF Transmitter & Receiver (Tx/Rx) chain)
  • Link budget, component and risk analysis

What you receive

  • R&D summary with the selected concept
  • Key performance targets and risk assessment
05

Step 5 ยท Engineering the solution

Design

Our engineers develop the complete design to the agreed specifications, including antennas and arrays, schematics and multilayer PCB layouts, and RF transmitter and receiver (Tx/Rx) circuits.

What we do

  • Antenna and phased-array design
  • Multilayer PCB layout, stack-up and impedance control
  • RF Transmitter & Receiver (Tx/Rx) circuit, schematic and component selection

What you receive

  • Design files and schematic for your review
  • Progress update at each milestone
06

Step 6 ยท Verify before you build

Simulation

Every design is verified and optimised with full-wave electromagnetic and circuit simulation, so performance issues are solved before any money is spent on hardware.

What we do

  • EM and circuit simulation in CST, HFSS and ADS
  • S-parameters, gain, efficiency and radiation patterns
  • Signal and power integrity (SI/PI) analysis

What you receive

  • Simulation report with results and plots
  • Design review meeting with your team
07

Step 7 ยท From files to prototype

Fabrication

We prepare manufacturing-ready files and coordinate PCB fabrication and prototype assembly, with a design-for-manufacturing check to avoid costly re-spins.

What we do

  • Gerber, drill, pick-and-place and BOM generation
  • Design-for-manufacturing (DFM) review
  • PCB fabrication and prototype assembly coordination

What you receive

  • Complete manufacturing package
  • Assembled prototype(s) ready for testing
08

Step 8 ยท Measured, validated performance

Testing

Prototypes are measured in our laboratory and anechoic chamber. Measured results are compared with simulation, and the design is fine-tuned where needed.

What we do

  • VNA S-parameter measurement (3 kHz to 20 GHz)
  • Gain and radiation pattern measurement in the anechoic chamber
  • Functional and performance validation

What you receive

  • Test report with measured vs simulated results
  • Recommendations for final optimisation
09

Step 9 ยท Complete package and support

Deliverables

You receive the complete, fully documented project package, ready for production or further development, with continued technical support after delivery.

Payment: the remaining 40% is paid on completion. All source files and documentation are delivered after full payment is received.

What we do

  • Final design and simulation source files
  • Gerbers, BOM, assembly drawings and test reports
  • Technical documentation and handover meeting
  • Final invoice (40%) issued on completion

What you receive

  • All project files and full documentation
  • Post-delivery technical support

Payment Terms

Milestone-based payments, each linked to a clear deliverable, so you only pay as the work progresses. Everything is agreed in writing in your quotation before any work starts.

30%

Project Start

When

When the quotation and scope are approved (Step 3).

You receive

Confirmed project plan, timeline and work started.

30%

Design Milestone

When

After the agreed design and simulation review (Steps 4โ€“6).

You receive

Design progress report with simulation results for your review.

40%

Final Delivery

When

On completion, after testing (Steps 7โ€“9).

You receive

All source files, design files, test reports and documentation.

30%30%40%

Good to Know

  • A formal invoice is issued for every milestone payment.
  • Third-party costs such as PCB fabrication, components and lab testing are quoted separately and paid before ordering.
  • Any change in scope is quoted in writing and agreed before extra work begins.
  • Full ownership of the design and all source files passes to you after the final payment.
  • Your project stays confidential under the signed NDA at every stage.
  • Payments are by direct bank transfer to our company account. View bank details โ†’

Ready to Start Your Project?

Send us a short brief with your project idea, budget and timeline. We will reply, send you our NDA, a clear quotation with payment terms, and guide you through the next steps.